The El Arrayan farm is located on a coastal hillside 400km (250 miles) north of the capital Santiago.
Built at a cost of $300m (£180m), it consists of 50 giant turbines with an installed capacity of 115 megawatts.
But despite its size, it represents less than 1% of Chile's total electricity generating capacity.